Schwabinger Gate combines a wide range of leisure activities with high-quality living. And that in the middle of Munich. From fancy restaurants to the Andaz Lifestyle Hotel by Hyatt to the weekend market, the centre that has been created here leaves nothing to be desired. With a modern exterior design as well as the revision of the adjacent green spaces, we at DÖRRIES Landschaftsbau have realised the clear structure of the ‘Schwabinger Tor’. The widespread use of natural stone paving in a wide variety of formats and designs ensures clear lines and patterns on the paths and squares. A special feature is the centre’s own tram station, which was built at the request of the Principal with our involvement. At times, work around the track took place while trams were running and at night. Natural stone paving inlays were used here, giving the square a haptic and structure in visual terms.

Slide

3 playgrounds

Slide
Slide

2 fountains

Slide

13,500 m²
natural stone

Bauherr

Jost Hurler JH Development GmbH

Auftraggeber

Jost Hurler JH Development GmbH

Landschaftsarchitekt

Landschaftsarchitektur GbR Kröniger Rümpelein Wenk, Freising

Objekt

Schwabinger Tor, Munich

Standort
Leopoldstraße, Munich

Leistungsumfang

  • Revision of 2 play areas and the green space of the City of Munich over the entire rear length of the new buildings of the ‘Schwabinger Gate’ construction project
  • Road construction, sand and green areas
  • Foundation work and support for installation of play equipment
  • 3,500 m² lawn seeding
  • 1,500 m² turf
  • 2,200 m² Olympiamastix mastic asphalt
  • 13,500 m² natural stone paving in various formats, bound and unbound
  • 3 playgrounds
  • 2 fountains
  • 5,300 m² tree planting, hedges, shrub areas
  • Irrigation sprinkler system
  • Roof greening on the underground car park

Bauzeit

October 2016 to June 2019

Besonderheit

The Principal wanted to build a dedicated tram station, which also involved work in the track area that was carried out while rail traffic was running. Night work in the track area and coloured asphalt within the track.

Completed in 33 months

Unser Portfolio