mobilmenu
KAPELLE-UFER BERLIN
PRINCIPAL:
 
CLIENT:
 
ARCHITECT:
 
OBJECT:
 
LOCATION:
 
ATTAINMENT:
 
 
 
BUILDING TIME:
 
SPECIALTY:
backback
berlinufer
Senat Berlin
 
DSK GmbH
 
Gruppe F, Berlin
 
Kapelle-Ufer
 
Berlin-Mitte
 
6.000 m² natural stone paving, 300 m handrails along the Spree riverside, 15.000 t substructure material, furnishing, illumination if the Spree wall 6 months
 
 
Narrow access to the building site under the Hugo-Preuss-Bridge with a 10t limitation.
KAPELLE-UFER BERLIN
PRINCIPAL:
 
CLIENT:
 
ARCHITECT:
 
OBJECT:
 
LOCATION:
 
ATTAINMENT:
 
 
 
BUILDING TIME:
 
SPECIALTY:
backback
berlinufer
Senat Berlin
 
DSK GmbH
 
Gruppe F, Berlin
 
Kapelle-Ufer
 
Berlin-Mitte
 
6.000 m² natural stone paving, 300 m handrails along the Spree riverside, 15.000 t substructure material, furnishing, illumination if the Spree wall 6 months
 
 
Narrow access to the building site under the Hugo-Preuss-Bridge with a 10t limitation.